sales@matimco.ae+971 58 584 7859

MATIMCO · EQUIPMENT & APPLICATIONS

AC EV charging equipment

Explore AC charging requirements for vehicles that remain parked for longer periods. Define the installation around user access, the vehicles served, site electrical capacity and charging management.

AC EV charging equipment

PROJECT PLANNING

AC charging: turn parked time into a charging plan

AC charging supplies alternating current to the vehicle, where its onboard charger converts it for the battery. It is worth evaluating when vehicles stay parked long enough to receive the energy they need before departure.

Check the charging arrangement before choosing a rating
Planning questionAC charging considerationWhen to compare DC
How long are vehicles parked?Work from the available charging window, including departure times.Energy demand is too high for the available parking window.
What can each vehicle accept?The onboard AC charger and connector can limit charging power.Vehicle DC compatibility and charging behaviour support the use case.
How many bays operate together?Check simultaneous charging and how site power is shared.High-use bays need a different turnaround arrangement.
Who uses the chargers?Define access control, connectivity and management requirements.Public or fleet operation needs a different service model.

Before you choose

Will a higher-rated AC charger always charge the vehicle faster?

No. The vehicle onboard charger, connection and available site power can limit actual charging. Match the equipment to the vehicles and operating schedule rather than choosing by nameplate rating alone.

How do I estimate the average charging power needed?

Divide the energy needed by the available hours. For example, 30 kWh over six hours is an average of 5 kW at the battery. Allow separately for losses, simultaneous sessions and other site loads; this is an energy budget, not an electrical design.

Call MatimcoProject enquiry ↗